DJ Basin Horizontal Well Offset Policy Now In Effect

Colorado Oil and Gas Commission

Colorado Oil and Gas Commission

The Colorado Oil and Gas Conservation Commission (COGCC) released their DJ Basin Horizontal Offset Policy on June, 20, 2013.  The policy addresses the theoretic potential for communication between horizontal wells that are being hydraulically stimulated and nearby offset wells in the DJ basin. This policy is explicitly meant to protect the Public Health, Safety and Welfare.  The COGCC Engineer will carefully evaluate all wells within 1500’ of the proposed wellbore to determine if those wells are adequately isolated. Beginning June 20, 2013, notice shall be provided to all offset well operators within 1500’ of the horizontal wellbore 90 days prior to the anticipated commencement of hydraulic stimulation.

Read the COGCC DJ Basin Horizontal Well Offset Policy

Share Button
Print Friendly, PDF & Email
This entry was posted in Drilling, Environment, Field Rules, HydroFracking, Site Rules and tagged , , , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*